#3

Demolition continues as we work to sort out the electrical.   At this point we will stick with three phase power.   The impact / permit fees we will owe the city are significant, but, as much of the needed equipment has already been built, it is the cheapest way to go from here.   

IMG_9817.jpg

The trench has been backfilled, and you can see that we moved the condenser for the house a/c to the front yard, a lovely addition, but thankfully temporary, there just wasn't anywhere else to put it that wouldn't be in the way for now.  

IMG_7180.jpg

Most of the trees are now gone, but the addition to the house remained for a few more days while a plan was made for the electrical.

IMG_9812.jpg

Finally the addition was torn off, although they left a small corner where the mast for the electrical comes into the house, once things get switched over that will be torn off.

IMG_9818.jpg

Just a small tree is left to pull out and then the hole to fill and they should be able to start digging for footings.