#19

I’ve been giving a lot of tours of the construction site lately. Without fail everyone asks when we expect to be finished and ready to move in. The truth is I have no idea. At one point I was hoping it would be March, now I’m hoping it’s May, but really, no idea. Honestly, for now as long as people continue to show up and work every day I’m happy.

Sheetrock began in the hallway. 2 layers of 5/8’ with staggered seems in the hallway. Both layers were taped and mudded.

Sheetrock began in the hallway. 2 layers of 5/8’ with staggered seems in the hallway. Both layers were taped and mudded.

IMG_1604.jpg
HVAC work began with some duct work in the lobby. Some careful planning allowed for the ducts to live in the trusses and buy us some much appreciated ceiling height.

HVAC work began with some duct work in the lobby. Some careful planning allowed for the ducts to live in the trusses and buy us some much appreciated ceiling height.

Some of the Samsung mini split  / heat pump units.

Some of the Samsung mini split / heat pump units.

You can see the rails for hanging the hvac units.

You can see the rails for hanging the hvac units.

All of the electrical boxes are wrapped with putty packs to help with the integrity of the sound envelope.

All of the electrical boxes are wrapped with putty packs to help with the integrity of the sound envelope.

I know it’s kind of dumb but when these isomax clips showed up I was genuinely excited.

I know it’s kind of dumb but when these isomax clips showed up I was genuinely excited.

The clips are screwed into the studs and then the hat channel hangs in the clips. The rubber material helps isolate the sheetrock from the studs and drops the sound transmission through the walls significantly.

The clips are screwed into the studs and then the hat channel hangs in the clips. The rubber material helps isolate the sheetrock from the studs and drops the sound transmission through the walls significantly.

IMG_1638.jpg
Iso clips and channel hung in control room 1.

Iso clips and channel hung in control room 1.

Iso clips and channel hung in tracking room 1.

Iso clips and channel hung in tracking room 1.