Busy week and weekend in the studio, but things continued out back in the new space. Most of the progression this week was in electrical, but there was a lot of leftover framing done, as well as many meetings regarding hvac and sheetrock.

The south side wall of tracking room 1 was sheeted which does even more to show the size of rooms and how things will feel. In the center you can see the window into the control room.

The south side wall of tracking room 1 was sheeted which does even more to show the size of rooms and how things will feel. In the center you can see the window into the control room.

Looking out of control room 1, the sheeting helps show off just how large the windows will be and how great the view of the tracking room will be.

Looking out of control room 1, the sheeting helps show off just how large the windows will be and how great the view of the tracking room will be.

The south side of tracking room 2 also got sheeting.

The south side of tracking room 2 also got sheeting.

The electricians made some headway this week. There was some discussion as to how to mount the electrical boxes and keep them isolated from the framed walls but sitting in the sheetrock and other acoustic materials which will be mounted. The solutio…

The electricians made some headway this week. There was some discussion as to how to mount the electrical boxes and keep them isolated from the framed walls but sitting in the sheetrock and other acoustic materials which will be mounted. The solution was to use some isolation material between the mounting hardware for the electrical and the framing.

Managed to get my son involved building a box for our new fire pit.