The walls are nearly there, the lobby area has reached the top and the studio section has 8 feet left to go. We expect the block to be finished this week, with the underground work (plumbing, electrical, audio) to follow right after.
The walls are nearly there, the lobby area has reached the top and the studio section has 8 feet left to go. We expect the block to be finished this week, with the underground work (plumbing, electrical, audio) to follow right after.